Client: Amalgamated Construction (AMCO Rail)

Location: Awsworth Road, Ilkeston.

Products: Stirling Lloyd Par 1 Primer, One Coat Eliminator, Bond Coat 3


Route One Rail have been employed by AMCO Rail to carry out the bridge deck waterproofing and expansion joint works on their project at Awsworth Road for Network Rail.

During their first visit to site, the installation team prepared the concrete deck by means of enclosed shot blasting and open blasting prior to priming, using Stirling Lloyd’s PAR 1 Primer.

Route One then sprayed the deck with Stirling Lloyd’s Eliminator one coat system, followed by Bond Coat 3 to enhance the ‘bond’ between the waterproofing system and the surfacing that will follow.

Route One will be returning to site for the second visit and will be installing the Stirling Lloyd Sentinel EMR100 expansion joint system.