Case Study: Rochdale Station Bridge

July 14, 2016

1 (2)2 (2)3 (2)

 

Client: Buckingham Group.

Location: Rochdale Station Bridge.

Products: Stirling Lloyd Hytec Sheet Waterproofing, Mechanically Fixed Hytec Wall Trims, Hytec Geo 1000 Protective Matting.


Buckingham Group employed Route One Rail to carry out the waterproofing works to Rochdale Station Bridge.

Route One operatives applied Hytec Geo 1000 protective matting to the bridge deck before installing Stirling Lloyd Hytec Sheet Waterproofing.

Mechanically fixed Hytec wall trims were then installed and the Hytec welded to the trims.

With another layer of geo-matting protection, the project was completed.